POWER & UTILITY

Power Distribution & Utility

Robust electrical infrastructure engineering from utility service entrances, substations, and main switchgear through sub-distribution.

Commercial
NYC Commercial Scale
Disciplined
On-Time Delivery
DOB Approved
NYC Inspection Sign-off
24/7 On-Call
Rapid Emergency Dispatch

Overview

Turnkey high-capacity electrical contracting

Power distribution is the heartbeat of any commercial or industrial facility. AGG Controls specializes in high-voltage utility entrances, ConEdison service coordination, switchboard replacements, step-down transformers, automatic transfer switches (ATS), and emergency generator power sync. We build resilient electrical backbones that ensure maximum power quality and reliable continuous operations.

Our engineering team provides comprehensive design-assist, field wiring, load auditing, and installation management tailored for NYC commercial and industrial standards.

Code compliant

NYC DOB and NEC 2023 from filing to sign-off.

Up to 4000A

120V / 208V / 480V three-phase service.

Full handover

As-built drawings and DOB inspection certificate.

Scope of Work

Core capabilities and deliverables

All deliverables are executed to NECA 1 workmanship standards and NYC DOB requirements.

01

Power distribution

  • Main Electrical Service Entrances

    Engineered and installed to NYC DOB and NEC compliance.

  • High-Voltage Switchgear & Switchboards

    Engineered and installed to NYC DOB and NEC compliance.

  • Step-Down & Step-Up Transformers

    Engineered and installed to NYC DOB and NEC compliance.

02

Industrial & resilience

  • ConEdison & Utility Service Coordination

    High-reliability emergency backup and machine wiring.

  • Automatic Transfer Switches (ATS)

    High-reliability emergency backup and machine wiring.

  • Emergency Standby Generator Systems

    High-reliability emergency backup and machine wiring.

03

Lighting, controls & engineering

  • Busduct & Feeder Riser Installations

    Integrated controls, testing, and capacity reporting.

  • Power Factor & Harmonics Mitigation

    Integrated controls, testing, and capacity reporting.

Technical Specifications

Engineering at a glance

Voltage Scope480V / 4160V / 13.8kV Medium & Low Voltage
Utility InterconnectionConEdison & PSEG Long Island Coordination
Testing StandardNETA Acceptance & Maintenance Testing
Conductor SpecificationsTHHN/THWN-2 Copper & Silver-Plated Busbar

Delivery Process

A disciplined four-phase framework

Designed to minimize facility downtime and keep every project inspection-ready.

  1. 01

    Utility Service Application & Engineering

    Filing layout drawings with ConEdison/PSEG for service upgrades, transformer vault specs, and metering.

    Deliverable: Utility plan approval

  2. 02

    Switchgear Fabrication & Rigging

    Sourcing custom-engineered NEMA-rated switchboards, busducts, and transformer rigging.

    Deliverable: Switchgear placement

  3. 03

    Feeder Routing & Wire Splicing

    High-amp wire pulling, parallel feeder termination, and high-voltage cable splicing.

    Deliverable: High-voltage termination

  4. 04

    NETA High-Pot Testing & Energization

    Hi-pot testing, micro-ohm contact resistance tests, and live utility energization coordination.

    Deliverable: NETA test certificate

Selected Work

Representative NYC projects

Financial District Switchboard Modernization📍 Wall Street Area, NY

Financial District Switchboard Modernization

Scope
13.8kV Utility Entrance + Transformer Installation
Result
Upgraded vault equipment and boosted main distribution capacity.
Commercial Complex Standby Generator & ATS Integration📍 Downtown Brooklyn, NY

Commercial Complex Standby Generator & ATS Integration

Scope
Diesel Standby Generator + Dual ATS System
Result
Achieved automatic standby power cutover for critical safety systems.

FAQ

Common questions

How long does a utility service upgrade with ConEdison typically take?+

Utility upgrades involve engineering review, layout approval, transformer vault prep, and cutover scheduling. We assist in expediting submittals to streamline utility lead times.

What is the difference between ATS and Manual Transfer Switches?+

An Automatic Transfer Switch (ATS) monitors utility power continuously and triggers generator startup automatically upon outage detection. Manual switches require physical operation on-site.

Why is NETA testing required for main switchgear?+

NETA acceptance testing ensures switchgear has zero manufacturing defects, proper busbar torque, and dielectric strength before applying utility power.

Ready to engineer your electrical solution?

Speak with our Master Electricians about single-line diagrams, DOB filings or your next commercial project for Power Distribution & Utility.