718-344-8736
Get Quote →

EV & ENERGY

EV & Energy Infrastructure

Commercial EV charging hubs, fleet electrification, dynamic power management, commercial solar PV wiring, and battery energy storage systems (BESS).

Commercial
NYC Commercial Scale
Disciplined
On-Time Delivery
DOB Approved
NYC Inspection Sign-off
24/7 On-Call
Rapid Emergency Dispatch

Overview

Turnkey high-capacity electrical contracting

The transition to electric mobility and clean energy requires serious high-amp electrical power infrastructure. AGG Controls delivers commercial EV charging solutions, fleet charging stations, utility power upgrades, commercial solar interconnections, and battery storage, helping NYC building owners capitalize on ConEdison PowerReady incentives.

Our engineering team provides comprehensive design-assist, field wiring, load auditing, and installation management tailored for NYC commercial and industrial standards.

Code compliant

NYC DOB and NEC 2023 from filing to sign-off.

Up to 4000A

120V / 208V / 480V three-phase service.

Full handover

As-built drawings and DOB inspection certificate.

Scope of Work

Core capabilities and deliverables

All deliverables are executed to NECA 1 workmanship standards and NYC DOB requirements.

01

Power distribution

  • Commercial Level 2 EV Charger Installation

    Engineered and installed to NYC DOB and NEC compliance.

  • DC Fast Charging (DCFC) Hub Infrastructure

    Engineered and installed to NYC DOB and NEC compliance.

  • Commercial EV Fleet Power Management

    Engineered and installed to NYC DOB and NEC compliance.

02

Industrial & resilience

  • ConEdison PowerReady Incentive Filing & Support

    High-reliability emergency backup and machine wiring.

  • Panel Capacity & Riser Load Assessment

    High-reliability emergency backup and machine wiring.

  • Commercial Solar PV Array Electrical Integration

    High-reliability emergency backup and machine wiring.

03

Lighting, controls & engineering

  • Battery Energy Storage Systems (BESS)

    Integrated controls, testing, and capacity reporting.

  • Energy Metering & Dynamic Load Shaving Controls

    Integrated controls, testing, and capacity reporting.

Technical Specifications

Engineering at a glance

Charger RatingsLevel 2 (40A-80A) / DC Fast Chargers (50kW - 350kW)
Incentive ProgramConEdison PowerReady Utility Subsidy Support
Load ManagementDynamic Automated Peak Load Shaving
StandardsUL 2202, NEC Article 625, NFPA 855

Delivery Process

A disciplined four-phase framework

Designed to minimize facility downtime and keep every project inspection-ready.

  1. 01

    Utility Capacity & Site Assessment

    Auditing existing main service panels, transformer headroom, and conduit pathways.

    Deliverable: Capacity evaluation

  2. 02

    ConEd Incentive & Permit Filing

    Filing ConEdison PowerReady incentive applications and submitting DOB engineering plans.

    Deliverable: Utility incentive filing

  3. 03

    Wiring & Charger Installation

    Installing heavy conduit, pulling copper feeders, and mounting EV chargers.

    Deliverable: Charger installation

  4. 04

    Software Integration & Commissioning

    Connecting chargers to cloud network portals for RFID payment, access control, and load balancing.

    Deliverable: Commissioned network portal

Selected Work

Representative NYC projects

Brooklyn Commercial Parking Garage EV Charging Hub📍 Downtown Brooklyn, NY

Brooklyn Commercial Parking Garage EV Charging Hub

Scope
Level 2 Chargers + DC Fast Chargers with Load Management
Result
Secured ConEd PowerReady utility rebate and installed dynamic load sharing.
Long Island Commercial Solar + Battery Storage📍 Melville, NY

Long Island Commercial Solar + Battery Storage

Scope
Solar PV Array + Battery Backup Infrastructure
Result
Shaved peak demand utility bills and provided emergency backup.

FAQ

Common questions

What is the ConEdison PowerReady EV incentive program?+

ConEdison’s PowerReady program provides financial incentives covering utility infrastructure costs for commercial properties installing EV chargers in NYC.

Will installing multiple EV chargers overload my building’s electrical panel?+

Not necessarily. We deploy smart load management hardware that dynamically shares available electrical capacity between active vehicles.

What is NYC Local Law 130 regarding EV readiness?+

Local Law 130 requires commercial parking lots and garages to make a percentage of parking spaces EV-Ready with dedicated conduit and panel capacity.

Ready to engineer your electrical solution?

Speak with our Master Electricians about single-line diagrams, DOB filings or your next commercial project for EV & Energy Infrastructure.